Construction and projects

Schedule, budget, materials, contractors, BIM, and documents connected to actual execution.

For: Developers, general contractors, technical clients, and owners of major assets. This is not a ready-made module — the environment is engineered around the client’s data and workflows.

Illustrative interfaceOPERATING LOOP / 03
Construction and projects LIVE DATA
BLOCK B / BIM
PLAN / ACTUAL−3,2%

Structure76%

Facade41%

Engineering34%

Material M-204 affects facadeASSIGN

01 / WHAT BECOMES CONNECTED

The site connects schedule, materials, cost, and actual execution.

When facade delivery slips, the system shows impact on work packages, contractor, crane, budget, and completion date, then creates a governed decision.

01Project
02Work package
03Material
04Contractor
05Exception

02 / OPERATING WORKFLOW

  1. 01Connect plan and actuals
  2. 02Process documents
  3. 03Identify risk
  4. 04Assign an owner
  5. 05Verify closure

03 / SOURCE SYSTEMS

Keep existing systems. Add a shared operating core.

ERP, BIM, schedules, and execution documents are not replaced. A shared core links them through objects and events.

ERPSRC-01
BIMSRC-02
Project scheduleSRC-03
Execution documentsSRC-04

04 / FIRST PROJECT

SMALLEST REALISTIC ENTRY

A project control tower for one site.

One site and one costly decision cycle: material delivery, schedule impact, accountable action, verified result.

START WITH A WORKFLOW

Examine this workflow using your data.

Define the objects, sources, decisions, actions, roles, and the boundary of a first pilot.